Levarht is growing, expanding by a total of 7,000 square metres of company area, and 19 extra loading and unloading docks. This will happen in two stages, and this week the foundation was laid for stage 1. In the spring of 2016, Levarht will then have 4,000 additional metres, comprising 10 cold stores, 8 loading and unloading docks, and office space. The cold stores can be set individually to the right storage temperature, so the range of products can be stored even better.
Late 2016, stage 2 will be completed, so the company can start using another 3,000 square metres: 3 cold stores and 11 loading and unloading docks.