At R&M Forwarding, the first phase of a large-scale refrigeration project was recently completed. With the completion of this phase, the company has taken an important step in expanding its logistics capacity and making its facilities more sustainable.
© Kempen Koudetechniek
The new refrigerated complex provides space for up to 24,000 pallets, divided into 54 rooms equipped with mobile and pushback racks and eight ripening rooms.
© Kempen Koudetechniek
In addition, the building features a refrigerated packing and compressing mezzanine floor of 18,000 m².
© Kempen Koudetechniek
The entire building covers a total (ground) floor area of 40,000 m². Central to the sustainable design is an ammonia/CO₂ plant, which contributes to an energy-efficient and environmentally friendly refrigeration solution.
© Kempen Koudetechniek
With this development, R&M Forwarding strengthens its position as an innovative player in the logistics sector, ready for the future of cold storage and distribution.
© Kempen Koudetechniek
For more information:
Van Kempen Koudetechniek B.V.
[email protected]
www.vkkt.nl
R&M Forwarding
Peterselieweg 110/112
2988 DH Ridderkerk
Tel: +31 (0) 180 447 500
[email protected]
rmforwarding.com