Sign up for our daily Newsletter and stay up to date with all the latest news!

Subscribe I am already a subscriber

You are using software which is blocking our advertisements (adblocker).

As we provide the news for free, we are relying on revenues from our banners. So please disable your adblocker and reload the page to continue using this site.
Thanks!

Click here for a guide on disabling your adblocker.

Sign up for our daily Newsletter and stay up to date with all the latest news!

Subscribe I am already a subscriber

Jet cooler manufacturer reduces lead time

Jet-Ready Precoolers, invented and manufactured by Global Cooling Inc., are described by the company as "the industry standard for portable forced-air cooling tunnels. Time after time they have outperformed built-in-place bunker-wall and integrated-cooling systems".

Since their introduction, production lead time for the portable precoolers has averaged 6 to 7 weeks, says Global's President Jim Still.

Now, according to Still, “we are trying to always have some Jets on hand for immediate shipping. It's a bit surprising how well received this is, to tell a customer we can ship in one or two days instead of one or two months.”

Still says the Jet-Ready Precoolers can now be shipped immediately after receipt of payment arrangements.

“Our Jet Precoolers are made in America, right here in Philadelphia at the Philly Navy Yard business park,” said Jim J. Still, Global's Vice President. “All our components are the best that money can buy, and our portables are amazingly powerful. Time after time, we outperform bunker wall systems and farm-built box fans.”

For more information:
Jim Still
Global Cooling Inc.
Ph: +1 (844) 858-4621
jim.still@pre-coolers.net
www.precoolers.net

Publication date: